NEW QUESTION # 26
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use batch determination.
  • B. Use the material where-used report.
  • C. Use the material staging report.
  • D. Use the batch information cockpit.

Answer: D


NEW QUESTION # 27
Which time elements are relevant for lead time scheduling of a production order?

  • A. Float after production
  • B. Planned delivery time
  • C. Setup time
  • D. Total replenishment lead time

Answer: A,B


NEW QUESTION # 28
For which categories can you define BOMs in SAP S/4HANA?

  • A. Work Center
  • B. Class
  • C. Document Structure
  • D. Sales order

Answer: C,D


NEW QUESTION # 29
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To stage different components for a production line simultaneously
  • B. To provide timely updates of inventory management for the staged components
  • C. To determine the work in progress along the production line
  • D. To reduce the total production lead time for along production line

Answer: B,C


NEW QUESTION # 30
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Supply Network Planning (SNP)
  • B. Material Requirements Planning (MRP)
  • C. Demand Planning (DP)
  • D. Capacity Requirements Planning (CRP)

Answer: B


NEW QUESTION # 31
How can you carry out cost object controlling for production orders?

  • A. Milestone-related
  • B. Product-related
  • C. Cost-related
  • D. Order-related

Answer: B,D


NEW QUESTION # 32
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Material requirements planning
  • B. Manual planning without check
  • C. Forecast planning
  • D. Consumption-based planning

Answer: D


NEW QUESTION # 33
What does the material type influence?

  • A. Which document types are allowed
  • B. Which plant specific status is allowed
  • C. Which material master views can be maintained
  • D. Whether the material is produced in-house, procured externally or bouth

Answer: C,D


NEW QUESTION # 34
What is the purpose of collective orders?

  • A. To post any component withdrawal as single backflush with order confiramtion
  • B. To combine order management of co-products any by-products with the main product.
  • C. To post production costs on a cost collector instead of the production order
  • D. To manage production orders for an entire finished product on multiple levels

Answer: D


NEW QUESTION # 35
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, release, printing, goods issue, confirmation, goods receipt
  • B. Creation, release, settlement, goods issue, confirmation, goods receipt
  • C. Creation, availability check, release, material widrawal, confirmation
  • D. Creation, printing, release, goods issue, confirmation, goods receipt

Answer: A,C


NEW QUESTION # 36
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning with final assembly (40)
  • B. Make-to-stock production (10)
  • C. Planning without final assembly (50)
  • D. Make-to-order production (20)

Answer: A


NEW QUESTION # 37
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with a parallel sequence in the routing
  • B. A production line with prioritized alternative work centers
  • C. A production line with more than one work center
  • D. A production line with an alternative sequence in the routing

Answer: C


NEW QUESTION # 38
In the Schedule Production app which setting can you make for the planning strategy?

  • A. Planning mode
  • B. Fixed pegging
  • C. Direction
  • D. Scheduling control
  • E. Fitness level

Answer: A,C,D


NEW QUESTION # 39
How can you limit the validity of a bill of material (BOM)?

  • A. By material type
  • B. By period
  • C. By industry
  • D. By plant

Answer: B,D


NEW QUESTION # 40
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The assigned routing must NOT have alternative sequences.
  • B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • E. The assigned routing must be a rate routing.

Answer: B,C,D


NEW QUESTION # 41
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run MRP with automatic selection of production version.
  • B. Run MRP with quota arrangement.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Assign planned orders manual lying the planning table.

Answer: B,C


NEW QUESTION # 42
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. Alternative work centers are fully occupied.
  • B. The work center has several invidula capacities.
  • C. The finite Scheduling indicator is NOT set in the strategy profile.
  • D. The Change Planning Direction indicator is set in strategy profile.

Answer: B,C


NEW QUESTION # 43
......